ITAC Assessment: AS0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MODULAR OFFICE BUILDINGS
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 250
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,807 211,606
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,075 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,923

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $264 $2,663 $364
4,396
kWh
$(-100.0)
02 2.7261: Install timers and/or thermostats $458 $150 $458
5,569
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,834 $500 $3,834
45,721
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $247 - $247
2,931
kWh
-
05 2.4312: Improve lubrication practices $152 - $152
1,758
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $120 $100 $120
1,465
kWh
-
TOTAL RECOMMENDED $5,075 $3,413 $5,175
61,840
kWh
$(-100.0)
TOTAL IMPLEMENTED $4,923 $3,413 $5,023
60,082
kWh
$(-100.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs