ITAC Assessment: HO0089
ITAC logo
ITAC Assessment: HO0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Fibre Drums
NAICS
n/a
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 200,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,003 3,009,672
kWh
Natural Gas $27,248 4,002
MMBtu
Fuel Oil #4 $25,542 6,381
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,392 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $796 $1,987 $796
9,965
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $2,831 $400 $2,831
34,877
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $765 $640 $765
9,379
kWh
-
04 2.8113: Purchase gas directly from a contract gas supplier $8,000 $2,000 - $8,000
TOTAL RECOMMENDED $12,392 $5,027 $4,392
54,221
kWh
$8,000
TOTAL IMPLEMENTED $11,627 $4,387 $3,627
44,842
kWh
$8,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs