Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Social services, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM24 #07 Y:2024 Pay bills on time to avoid late fees $175 -
MUCM24 #06 Y:2024 Use proper thickness of insulation on building envelope $332 $1,021
MUCM24 #05 Y:2024 Close holes and openings in building such as broken windows $1,516 $527
MUCM24 #04 Y:2024 Use or replace with energy efficient substitutes $1,693 $3,000
MUCM24 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $4,029 $5,991
MUCM24 #02 Y:2024 Install occupancy sensors $735 $237
MUCM24 #01 Y:2024 Use optimum temperature $419 -
AS0550 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $152 $109
AS0550 #02 Y:2023 Begin a practice of predictive / preventative maintenance $2,005 $6,140
AS0550 #01 Y:2023 Use proper thickness of insulation on building envelope $7,435 $22,586
AS0549 #06 Y:2023 Install occupancy sensors $149 $277
AS0549 #05 Y:2023 Install timers and/or thermostats $328 $540
AS0549 #04 Y:2023 Install spectral reflectors / delamp $800 $685
AS0549 #03 Y:2023 Install timers on light switches in little used areas $3,340 $6,151
AS0549 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $15,226 $17,834
AS0549 #01 Y:2023 Replace fossil fuel equipment with electrical equipment $41,664 $123,750
MUCM10 #11 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,533 $5,241
MUCM10 #10 Y:2023 Use separate switches on perimeter lighting which may be turned off when natural light is available $332 $648
MUCM10 #09 Y:2023 Install occupancy sensors $54 $33
MUCM10 #08 Y:2023 Utilize higher efficiency lamps and/or ballasts $366 $1,749