ITAC Assessment: AS0550
ITAC logo
ITAC Assessment: AS0550
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product food and shelter
NAICS 624210: Community Food Services
SIC 8399: Social Services, Not Elsewhere Classified
Sales Range less than $500
k
# of Employees 200
Plant Area 22,194
ft2
Annual Production 328,500
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,571 297,720
kWh
Electricity Demand $7,165 906
kW-mo/yr
Electricity Fees $16,518 -
Waste Disposal Costs
Water Usage $20,723 2,190
Tgal
TOTAL YEARLY COSTS $63,977
RECOMMENDED SAVINGS* $9,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7492: Use proper thickness of insulation on building envelope $7,435 $22,586 $7,435
113,108
kWh
-
02 4.611: Begin a practice of predictive / preventative maintenance $2,005 $6,140 $2,005
30,503
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $152 $109 $130
1,976
kWh
$22
-
kW-mo/yr
TOTAL RECOMMENDED $9,592 $28,835 $9,570
145,587
kWh
$22
-
kW-mo/yr
TOTAL IMPLEMENTED $9,592 $28,835 $9,570
145,587
kWh
$22
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs