Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Social services
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0610 #07 Y:2025 Install timers and/or thermostats $176 $187
AS0610 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $893 $510
AS0610 #05 Y:2025 Install spectral reflectors / delamp $1,308 $61
AS0610 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,539 $1,975
AS0610 #03 Y:2025 Replace fossil fuel equipment with electrical equipment $1,708 $950
AS0610 #02 Y:2025 Install occupancy sensors $2,279 $2,835
AS0610 #01 Y:2025 Lower ceiling to reduce conditioned space $2,349 $16,000
SU0572 #10 Y:2025 Use solar heat to make electricty $29,664 $180,240
SU0572 #09 Y:2025 Conserve energy by efficient use of vending machines $167 $359
SU0572 #08 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,746 $5,006
SU0572 #07 Y:2025 Use or replace with energy efficient substitutes $673 $691
SU0572 #06 Y:2025 Insulate bare equipment $813 $751
SU0572 #05 Y:2025 Apply for tax-free status for energy purchases $2,035 $65
SU0572 #04 Y:2025 Eliminate or reduce compressed air usage $144 -
SU0572 #03 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,576 -
SU0572 #02 Y:2025 Reduce space conditioning during non-working hours $4,651 -
SU0572 #01 Y:2025 Use or replace with energy efficient substitutes $1,783 -
MZ1014 #06 Y:2025 Use solar heat to make electricty $20,398 $146,247
MZ1014 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,690 $3,100
MZ1014 #04 Y:2025 Install occupancy sensors $412 $950