ITAC Assessment: MZ1014
ITAC logo
ITAC Assessment: MZ1014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product community center
NAICS 624110: Child and Youth Services
SIC 8322: Individual and Family Social Services
Sales Range less than $500
k
# of Employees 12
Plant Area 20,000
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,371 1,066,592
kWh
Electricity Demand $8,751 2,337
kW-mo/yr
Natural Gas $47,989 4,258
MMBtu
Waste Disposal Costs
Water Usage $6,978 2,622
Tgal
TOTAL YEARLY COSTS $163,089
RECOMMENDED SAVINGS* $47,348 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $2,794 $5,642 - - $2,794
-
MMBtu
02 2.2622: Replace existing chiller with high efficiency model $17,333 $125,000 $15,116
162,548
kWh
$2,217
-
kW-mo/yr
-
03 2.9112: Use solar heat to heat water $3,721 $34,860 $3,721
40,019
kWh
- -
04 2.7135: Install occupancy sensors $412 $950 $412
4,414
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,690 $3,100 $2,690
28,873
kWh
- -
06 2.9114: Use solar heat to make electricty $20,398 $146,247 $19,118
205,562
kWh
$1,280
-
kW-mo/yr
-
TOTAL RECOMMENDED $47,348 $315,799 $41,057
441,416
kWh
$3,497
-
kW-mo/yr
$2,794
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs