ITAC Assessment: MI0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product toilet tissue
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 240,000
ft2
Annual Production 20,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,782,797 39,116,945
kWh
Electricity Demand $281,484 70,313
kW-mo/yr
Electricity Fees $390,029 -
Natural Gas $1,132,450 187,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $700,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $606,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $500,499 - - - - $500,499
02 2.3137: Use power during off-peak periods $45,276 $2,000 - $45,276
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $42,782 $60 $38,181
477,264
kWh
$4,601
-
kW-mo/yr
- -
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $38,905 - - - $38,905
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,420 $920 $26,458
330,730
kWh
$2,962
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,600 $1,920 - $26,600
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $9,952 $3,680 $9,301
116,268
kWh
$651
-
kW-mo/yr
- -
08 2.2136: Install / repair insulation on steam lines $3,050 $2,904 - - $3,050
-
MMBtu
-
09 2.2136: Install / repair insulation on steam lines $2,341 $1,800 - - $2,341
-
MMBtu
-
10 2.1233: Analyze flue gas for proper air/fuel ratio $1,536 $1,500 - - $1,536
-
MMBtu
-
TOTAL RECOMMENDED $700,361 $14,784 $73,940
924,262
kWh
$80,090
-
kW-mo/yr
$45,832
-
MMBtu
$500,499
TOTAL IMPLEMENTED $606,228 $9,104 $64,639
807,994
kWh
$34,163
-
kW-mo/yr
$6,927
-
MMBtu
$500,499
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs