Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

658

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Educational services
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0289 #06 Y:2025 Ventilation system to shut off when room is not in use $2,544 $2,000
UU0289 #05 Y:2025 Install occupancy sensors $400 $1,510
UU0289 #04 Y:2025 Use solar heat to make electricty $24,834 $237,360
UU0289 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $490 $3,590
UU0289 #02 Y:2025 Use radiant heater for spot heating $1,570 $9,150
UU0289 #01 Y:2025 Use battery storage for demand control $9,476 $40,110
UU0278 #05 Y:2025 Utilize a less expensive cooling method $1,117 $3,600
UU0278 #04 Y:2025 Reduce ventilation air $8,620 $16,080
UU0278 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $4,000 $16,200
UU0278 #02 Y:2025 Replace boiler $12,650 $52,800
UU0278 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,355 $10,800
MUCM30 #08 Y:2025 Insulate glazing, walls, ceilings, and roofs $647 $27
MUCM30 #07 Y:2025 Reduce space conditioning during non-working hours $165 -
MUCM30 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,505 $610
MUCM30 #05 Y:2025 Use photocell controls $164 $816
MUCM30 #04 Y:2025 Install timers on light switches in little used areas $754 $133
MUCM30 #03 Y:2025 Turn off equipment when not in use $501 -
MUCM30 #02 Y:2025 Reduce temperature of process equipment when on standby $2,242 -
MUCM30 #01 Y:2025 Turn off equipment when not in use $5,682 -
AM0964 #04 Y:2025 Use solar heat to make electricty $14,450 $391,560