755
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MUCM37 #09 Y:2026 | 09 | 2026 | Utilize higher efficiency lamps and/or ballasts | $3,408 | $6,089 |
n/a
|
| MUCM37 #08 Y:2026 | 08 | 2026 | Use photocell controls | $1,433 | $2,381 |
n/a
|
| MUCM37 #07 Y:2026 | 07 | 2026 | Make a practice of turning off lights when not needed | $15 | - |
n/a
|
| MUCM37 #06 Y:2026 | 06 | 2026 | Replace hydraulic / pneumatic equipment with electric equipment | $746 | $3,137 |
n/a
|
| MUCM37 #05 Y:2026 | 05 | 2026 | Reduce the pressure of compressed air to the minimum required | $155 | - |
n/a
|
| MUCM37 #04 Y:2026 | 04 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $1,071 | $207 |
n/a
|
| MUCM37 #03 Y:2026 | 03 | 2026 | Install / repair insulation on steam lines | $301 | $97 |
n/a
|
| MUCM37 #02 Y:2026 | 02 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $4,015 | $14,998 |
n/a
|
| MUCM37 #01 Y:2026 | 01 | 2026 | Install occupancy sensors | $6,709 | $14,664 |
n/a
|
| ORC026 #05 Y:2026 | 05 | 2026 | Reduce ventilation air | $5,887 | $35,000 |
n/a
|
| ORC026 #04 Y:2026 | 04 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $725 | $2,500 |
n/a
|
| ORC026 #03 Y:2026 | 03 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $3,008 | $5,000 |
n/a
|
| ORC026 #02 Y:2026 | 02 | 2026 | Install set-back timers | $589 | $20 |
n/a
|
| ORC026 #01 Y:2026 | 01 | 2026 | Utilize controls to operate equipment only when needed | $546 | - |
n/a
|
| LS0626 #04 Y:2026 | 04 | 2026 | Utilize higher efficiency lamps and/or ballasts | $2,518 | $2,295 |
n/a
|
| LS0626 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $1,624 | $875 |
n/a
|
| LS0626 #02 Y:2026 | 02 | 2026 | Chill water to the highest temperature possible | $10,589 | $500 |
n/a
|
| LS0626 #01 Y:2026 | 01 | 2026 | Reduce space conditioning during non-working hours | $15,456 | $175 |
n/a
|
| LS0526 #06 Y:2026 | 06 | 2026 | Clean or color roof to reduce solar load | $20,698 | $48,296 |
n/a
|
| LS0526 #05 Y:2026 | 05 | 2026 | Replace existing chiller with high efficiency model | $31,399 | $70,000 |
n/a
|