Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

755

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Educational services
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MUCM37 #09 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,408 $6,089
MUCM37 #08 Y:2026 Use photocell controls $1,433 $2,381
MUCM37 #07 Y:2026 Make a practice of turning off lights when not needed $15 -
MUCM37 #06 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $746 $3,137
MUCM37 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $155 -
MUCM37 #04 Y:2026 Utilize energy-efficient belts and other improved mechanisms $1,071 $207
MUCM37 #03 Y:2026 Install / repair insulation on steam lines $301 $97
MUCM37 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,015 $14,998
MUCM37 #01 Y:2026 Install occupancy sensors $6,709 $14,664
ORC026 #05 Y:2026 Reduce ventilation air $5,887 $35,000
ORC026 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $725 $2,500
ORC026 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,008 $5,000
ORC026 #02 Y:2026 Install set-back timers $589 $20
ORC026 #01 Y:2026 Utilize controls to operate equipment only when needed $546 -
LS0626 #04 Y:2026 Utilize higher efficiency lamps and/or ballasts $2,518 $2,295
LS0626 #03 Y:2026 Install occupancy sensors $1,624 $875
LS0626 #02 Y:2026 Chill water to the highest temperature possible $10,589 $500
LS0626 #01 Y:2026 Reduce space conditioning during non-working hours $15,456 $175
LS0526 #06 Y:2026 Clean or color roof to reduce solar load $20,698 $48,296
LS0526 #05 Y:2026 Replace existing chiller with high efficiency model $31,399 $70,000