Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Tire retreading and repair shops
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0084 #10 Y:2012 Operate boilers on high fire setting $10,918 $1,770
MZ0084 #09 Y:2012 Insulate bare equipment $1,483 $2,500
MZ0084 #08 Y:2012 Eliminate/reduce an operation $6,939 -
MZ0084 #07 Y:2012 Reschedule plant operations or reduce load to avoid peaks $1,142 $1,000
MZ0084 #06 Y:2012 Turn off equipment during breaks, reduce operating time $7,736 $11,730
MZ0084 #05 Y:2012 Install outside air damper / economizer on hvac unit $12,831 $37,520
MZ0084 #04 Y:2012 Utilize outside air instead of conditioned air for drying $1,897 $2,400
MZ0084 #03 Y:2012 Reduce the pressure of compressed air to the minimum required $2,987 $500
MZ0084 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,756 $3,500
MZ0084 #01 Y:2012 Utilize higher efficiency lamps and/or ballasts $5,602 $15,200
AS0388 #07 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $4,505 $1,477
AS0388 #06 Y:2004 Replace existing hvac unit with high efficiency model $953 $1,400
AS0388 #05 Y:2004 Use most efficient type of electric motors $1,196 $1,247
AS0388 #04 Y:2004 Use waste heat from hot flue gases to preheat $283 $800
AS0388 #03 Y:2004 Replace purchased steam with other energy source $366 $1,530
AS0388 #02 Y:2004 Insulate bare equipment $1,489 $815
AS0388 #01 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $50,081 $440
MI0037 #06 Y:2002 Install soft-start to eliminate nuisance trips $7,104 $3,545
MI0037 #05 Y:2002 Turn off equipment during breaks, reduce operating time $2,419 $250
MI0037 #04 Y:2002 Minimize operation of equipment maintained in standby condition $12,505 $1,250