ITAC Assessment: AS0388
ITAC logo
ITAC Assessment: AS0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aircraft Tire Retreading
NAICS 326212: Tire Retreading
SIC 7534: Tire Retreading and Repair Shops
Sales Range $5
M
to 10
M
# of Employees 49
Plant Area 54,000
ft2
Annual Production 48,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,695 3,146,240
kWh
Electricity Demand $70,184 7,388
kW-mo/yr
Electricity Fees $57,973 -
Natural Gas $95,961 12,495
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,873 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,081

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $50,081 $440 $39,873
526,029
kWh
$10,208
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $1,489 $815 - - $1,489
-
MMBtu
03 2.1392: Replace purchased steam with other energy source $366 $1,530 $366
4,828
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $283 $800 - - $283
-
MMBtu
05 2.4133: Use most efficient type of electric motors $1,196 $1,247 $953
12,564
kWh
$243
-
kW-mo/yr
-
06 2.7232: Replace existing hvac unit with high efficiency model $953 $1,400 $631
8,320
kWh
$322
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,505 $1,477 $3,588
47,334
kWh
$917
-
kW-mo/yr
-
TOTAL RECOMMENDED $58,873 $7,709 $45,411
599,075
kWh
$11,690
-
kW-mo/yr
$1,772
-
MMBtu
TOTAL IMPLEMENTED $50,081 $440 $39,873
526,029
kWh
$10,208
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs