ITAC Assessment: MZ0084
ITAC logo
ITAC Assessment: MZ0084
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product tire retrading
NAICS 326212: Tire Retreading
SIC 7534: Tire Retreading and Repair Shops
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 120,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,450 572,605
kWh
Electricity Demand $8,345 3,129
kW-mo/yr
Natural Gas $192,894 27,756
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,433

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,602 $15,200 $5,391
44,928
kWh
$211
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,756 $3,500 $3,614
30,264
kWh
$142
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,987 $500 $2,987
24,892
kWh
- -
04 2.2711: Utilize outside air instead of conditioned air for drying $1,897 $2,400 $1,897
15,810
kWh
- -
05 2.7241: Install outside air damper / economizer on hvac unit $12,831 $37,520 - - $12,831
-
MMBtu
06 2.6212: Turn off equipment during breaks, reduce operating time $7,736 $11,730 $7,736
64,464
kWh
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,142 $1,000 - $1,142
-
kW-mo/yr
-
08 3.1161: Eliminate/reduce an operation $6,939 - - - $6,939
-
MMBtu
09 2.2511: Insulate bare equipment $1,483 $2,500 - - $1,483
-
MMBtu
10 2.1212: Operate boilers on high fire setting $10,918 $1,770 - - $10,918
-
MMBtu
TOTAL RECOMMENDED $55,290 $76,120 $21,624
180,358
kWh
$1,495
-
kW-mo/yr
$32,171
-
MMBtu
TOTAL IMPLEMENTED $36,433 $34,700 $16,740
139,656
kWh
$353
-
kW-mo/yr
$19,340
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs