| Assessment Year | 2002 |
|---|---|
| Principal Product | Rethreading Aircraft Tires |
| NAICS |
n/a
|
| SIC | 7534: Tire Retreading and Repair Shops |
| Sales Range | $1 M to 5M |
| # of Employees | 65 |
| Plant Area |
47,000
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $125,935 | 1,991,040 |
kWh
|
$0.063 |
| Electricity Demand | $36,349 | 4,602 |
kW-mo/yr
|
$7.90 |
| Natural Gas | $115,418 | 57,706 |
MMBtu
|
$2.00 |
| LPG | $7,043 | 4,063 |
MMBtu
|
$1.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $73,783 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $54,174 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $31,994 | $1 |
$31,994
505,440
kWh
|
- | |
| 02 | 2.4321: Upgrade obsolete equipment | $12,400 | $24,000 |
$12,400
175,800
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,361 | $120 |
$7,134
140,582
kWh
|
$227
-
kW-mo/yr
|
|
| 04 | 2.6242: Minimize operation of equipment maintained in standby condition | $12,505 | $1,250 |
$10,032
158,496
kWh
|
$2,473
-
kW-mo/yr
|
|
| 05 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,419 | $250 |
$2,419
38,220
kWh
|
- | |
| 06 | 2.4112: Install soft-start to eliminate nuisance trips | $7,104 | $3,545 | - |
$7,104
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $73,783 | $29,166 |
$63,979
1,018,538
kWh
|
$9,804
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $54,174 | $24,371 |
$53,947
860,042
kWh
|
$227
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs