ITAC Assessment: MI0037
ITAC logo
ITAC Assessment: MI0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Rethreading Aircraft Tires
NAICS
n/a
SIC 7534: Tire Retreading and Repair Shops
Sales Range $1
M
to 5
M
# of Employees 65
Plant Area 47,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,935 1,991,040
kWh
Electricity Demand $36,349 4,602
kW-mo/yr
Natural Gas $115,418 57,706
MMBtu
LPG $7,043 4,063
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,783 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4322: Use or replace with energy efficient substitutes $31,994 $1 $31,994
505,440
kWh
-
02 2.4321: Upgrade obsolete equipment $12,400 $24,000 $12,400
175,800
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,361 $120 $7,134
140,582
kWh
$227
-
kW-mo/yr
04 2.6242: Minimize operation of equipment maintained in standby condition $12,505 $1,250 $10,032
158,496
kWh
$2,473
-
kW-mo/yr
05 2.6212: Turn off equipment during breaks, reduce operating time $2,419 $250 $2,419
38,220
kWh
-
06 2.4112: Install soft-start to eliminate nuisance trips $7,104 $3,545 - $7,104
-
kW-mo/yr
TOTAL RECOMMENDED $73,783 $29,166 $63,979
1,018,538
kWh
$9,804
-
kW-mo/yr
TOTAL IMPLEMENTED $54,174 $24,371 $53,947
860,042
kWh
$227
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs