ITAC Assessment: IA0044
ITAC logo
ITAC Assessment: IA0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product paper and plastic sacks and bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 250,000
ft2
Annual Production 50,005
ton
Production Hrs. Annual 8,568
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $375,366 9,770,516
kWh
Natural Gas $77,232 16,801
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,709 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $22,858 $7,278 - $22,858
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $4,209 $630 $4,209
109,613
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,777 $5,800 $2,777
72,392
kWh
-
04 2.7135: Install occupancy sensors $1,001 $864 $1,001
26,084
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $739 $73 $739
19,343
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $125 $240 $125
3,224
kWh
-
TOTAL RECOMMENDED $31,709 $14,885 $8,851
230,656
kWh
$22,858
-
MMBtu
TOTAL IMPLEMENTED $7,850 $6,743 $7,850
204,572
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs