ITAC Assessment: CO0525
ITAC logo
ITAC Assessment: CO0525
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 56,500
ft2
Annual Production 56,261,000
thousand feet
Production Hrs. Annual 4,420
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $479,990 11,256,995
kWh
Electricity Demand $178,050 29,775
kW-mo/yr
Electricity Fees $1,248 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,334

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $26,130 $1,920 $21,830
526,100
kWh
$4,300
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $5,159 $8,136 $3,567
85,980
kWh
$1,592
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,150 $16,560 $11,070
266,800
kWh
$2,180
-
kW-mo/yr
$1,900
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,910 - $14,910
359,400
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,183 $8,431 $8,032
193,423
kWh
$1,541
-
kW-mo/yr
$(-390.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,860 $4,972 $3,544
85,289
kWh
$707
-
kW-mo/yr
$1,609
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,150 $3,540 $790
19,100
kWh
$360
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,092 $1,126 $1,107
26,673
kWh
$222
-
kW-mo/yr
$(-237.0)
TOTAL RECOMMENDED $78,634 $44,685 $64,850
1,562,765
kWh
$10,902
-
kW-mo/yr
$2,882
TOTAL IMPLEMENTED $62,334 $24,585 $52,990
1,276,865
kWh
$8,362
-
kW-mo/yr
$982
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs