Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous business services
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0238 #05 Y:2023 Lower temperature during the winter season and vice-versa $2,731 $5,916
UU0238 #04 Y:2023 Clean condenser tubes $3,894 $3,890
UU0238 #03 Y:2023 Optimize plant power factor $7,670 $22,500
UU0238 #02 Y:2023 Utilize controls to operate equipment only when needed $12,624 $12,621
UU0238 #01 Y:2023 Turn off equipment when not in use $13,223 $4,080
AS0532 #08 Y:2022 Install occupancy sensors $50 $138
AS0532 #07 Y:2022 Turn off equipment when not in use $230 $25
AS0532 #06 Y:2022 Turn off equipment when not in use $490 $300
AS0532 #05 Y:2022 Close holes and openings in building such as broken windows $533 $158
AS0532 #04 Y:2022 Install timers on light switches in little used areas $2,148 $2,555
AS0532 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,744 $6,177
AS0532 #02 Y:2022 Use solar heat to make electricty $6,151 $182,215
AS0532 #01 Y:2022 Air condition only space necessary $5,668 $800
OR0714 #05 Y:2018 Use waste heat from hot flue gases to preheat $1,732 $10,902
OR0714 #04 Y:2018 Size electric motors for peak operating efficiency $6,441 $23,733
OR0714 #03 Y:2018 Reduce space conditioning during non-working hours $21,372 $29,440
OR0714 #02 Y:2018 Use computer programs to optimize hvac performance $40,772 $23,842
OR0714 #01 Y:2018 Minimize use of outside make-up air for ventilation except when used for economizer cycle $56,799 $168,000
UK1506 #18 Y:2015 Use only certified motor repair shops $2,252 -
UK1506 #17 Y:2015 Utilize energy-efficient belts and other improved mechanisms $151 -