Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Beauty shops
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0376 #06 Y:2009 Use adjustable frequency drive or multiple speed motors on existing system $4,348 $20,943
SF0376 #05 Y:2009 Modify refrigeration system to operate at a lower pressure $17,149 $75,000
SF0376 #04 Y:2009 Avoid frost formation on evaporators $2,865 $9,600
SF0376 #03 Y:2009 Install occupancy sensors $2,011 $6,725
SF0376 #02 Y:2009 Utilize higher efficiency lamps and/or ballasts $34,155 $110,307
SF0376 #01 Y:2009 Utilize energy-efficient belts and other improved mechanisms $397 $535
SF0339 #07 Y:2006 Utilize higher efficiency lamps and/or ballasts $3,202 $14,292
SF0339 #06 Y:2006 Utilize higher efficiency lamps and/or ballasts $6,067 $10,458
SF0339 #05 Y:2006 Keep doors and windows shut when not on use $20,827 $26,019
SF0339 #04 Y:2006 Use most efficient type of electric motors $2,752 $1,890
SF0339 #03 Y:2006 Install occupancy sensors $2,186 $1,188
SF0339 #02 Y:2006 Remove or close off unneeded compressed air lines $9,340 $3,330
SF0339 #01 Y:2006 Modify refrigeration system to operate at a lower pressure $105,374 -
SF0338 #15 Y:2006 Eliminate/reduce an operation $187,500 $16,945
SF0338 #14 Y:2006 Eliminate/reduce an operation $123,261 $24,000
SF0338 #13 Y:2006 Size electric motors for peak operating efficiency $58,477 $704,893
SF0338 #12 Y:2006 Install / repair insulation on steam lines $2,832 $14,632
SF0338 #11 Y:2006 Install / repair insulation on steam lines $519 $2,033
SF0338 #10 Y:2006 Utilize higher efficiency lamps and/or ballasts $754 $2,432
SF0338 #09 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $2,014 $5,542