Assessment Year | 2007 |
---|---|
Principal Product | Packaged Produce |
NAICS | 115114: Postharvest Crop Activities (except Cotton Ginning) |
SIC | 723: Beauty Shops |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
45,000
ft2
|
Annual Production | 17,000,000
lb
|
Production Hrs. Annual | 3,400
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $571,466 | 4,067,888 |
kWh
|
$0.14 |
Electricity Demand | $183,544 | 10,338 |
kW-mo/yr
|
$17.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $149,748 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $140,408 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $105,374 | - |
$51,070
610,520
kWh
|
$54,304
-
kW-mo/yr
|
|
02 | 2.4235: Remove or close off unneeded compressed air lines | $9,340 | $3,330 |
$9,340
111,657
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $2,186 | $1,188 |
$1,164
14,392
kWh
|
$1,022
-
kW-mo/yr
|
|
04 | 2.4133: Use most efficient type of electric motors | $2,752 | $1,890 |
$1,565
12,480
kWh
|
$1,187
-
kW-mo/yr
|
|
05 | 2.7442: Keep doors and windows shut when not on use | $20,827 | $26,019 |
$15,567
186,097
kWh
|
$5,260
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,067 | $10,458 |
$3,408
42,157
kWh
|
$2,659
-
kW-mo/yr
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,202 | $14,292 |
$1,685
208,360
kWh
|
$1,517
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $149,748 | $57,177 |
$83,799
1,185,663
kWh
|
$65,949
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $140,408 | $53,847 |
$74,459
1,074,006
kWh
|
$65,949
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs