ITAC Assessment: SF0338
ITAC logo
ITAC Assessment: SF0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Packaged Produce
NAICS 115114: Postharvest Crop Activities (except Cotton Ginning)
SIC 723: Beauty Shops
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 125,000
ft2
Annual Production 357,000,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,645,617 20,069,749
kWh
Electricity Demand $587,059 40,259
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $721,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $440,697

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,653 $244 $1,128
14,256
kWh
$525
-
kW-mo/yr
-
02 2.2628: Utilize a less expensive cooling method $229,277 $80,000 $163,938
2,071,968
kWh
$65,339
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $9,563 $2,639 $6,138
77,576
kWh
$3,425
-
kW-mo/yr
-
04 2.4235: Remove or close off unneeded compressed air lines $8,934 $2,310 $8,934
112,918
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,287 $5,129 $9,551
115,706
kWh
$2,736
-
kW-mo/yr
-
06 2.7442: Keep doors and windows shut when not on use $46,653 $25,591 $34,389
434,652
kWh
$12,264
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,837 $3,351 $3,843
48,565
kWh
$1,994
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,070 $22,400 $32,070
405,325
kWh
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,014 $5,542 $2,014
25,462
kWh
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $754 $2,432 $510
6,977
kWh
$244
-
kW-mo/yr
-
11 2.2136: Install / repair insulation on steam lines $519 $2,033 $519
6,560
kWh
- -
12 2.2136: Install / repair insulation on steam lines $2,832 $14,632 $2,832
35,796
kWh
- -
13 2.4131: Size electric motors for peak operating efficiency $58,477 $704,893 $58,477
688,480
kWh
- -
14 3.1161: Eliminate/reduce an operation $123,261 $24,000 - - $123,261
-
lb
15 3.1161: Eliminate/reduce an operation $187,500 $16,945 - - $187,500
-
lb
TOTAL RECOMMENDED $721,631 $912,141 $324,343
4,044,241
kWh
$86,527
-
kW-mo/yr
$310,761
-
lb
TOTAL IMPLEMENTED $440,697 $789,641 $121,537
1,481,009
kWh
$8,399
-
kW-mo/yr
$310,761
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs