ITAC Assessment: MS0291
ITAC logo
ITAC Assessment: MS0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product recycled paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2611: Pulp Mills
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 550,000
ft2
Annual Production 96,200
ton
Production Hrs. Annual 7,392
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,353,170 68,207,832
kWh
Electricity Demand $739,507 129,284
kW-mo/yr
Electricity Fees $13,575,693 -
Natural Gas $1,546,515 222,197
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $389,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $71,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $224,456 $74,722 $21,383
619,793
kWh
$5,647
-
kW-mo/yr
$197,426 -
02 2.2437: Recover waste heat from equipment $42,324 $29,520 - - - $42,324
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $38,212 $8,550 $3,590
104,052
kWh
$1,387
-
kW-mo/yr
$33,235 -
04 2.1233: Analyze flue gas for proper air/fuel ratio $28,523 $2,000 - - - $28,523
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,397 $233 $1,808
52,397
kWh
- $16,589 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $10,825 $34,509 $1,029
29,823
kWh
$292
-
kW-mo/yr
$9,504 -
07 2.2136: Install / repair insulation on steam lines $10,794 $1,853 - - - $10,794
-
MMBtu
08 2.2135: Repair and eliminate steam leaks $9,158 $169 - - - $9,158
-
MMBtu
09 2.7229: Air condition only space necessary $6,088 $600 $428
12,312
kWh
$1,454
-
kW-mo/yr
$4,206 -
10 2.7221: Lower temperature during the winter season and vice-versa $973 - $96
2,774
kWh
- $877 -
TOTAL RECOMMENDED $389,750 $152,156 $28,334
821,151
kWh
$8,780
-
kW-mo/yr
$261,837 $90,799
-
MMBtu
TOTAL IMPLEMENTED $71,515 $31,606 $1,808
52,397
kWh
- $16,589 $53,118
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs