Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Personal services
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS0224 #07 Y:2023 Use solar heat to make electricty $38,021 $514,800
LS0224 #06 Y:2023 Replace existing hvac unit with high efficiency model $12,486 $113,400
LS0224 #05 Y:2023 Add equipment/ operators to reduce production bottleneck $175,678 $600,000
LS0224 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,104 $1,413
LS0224 #03 Y:2023 Recover waste heat from equipment $17,495 $20,000
LS0224 #02 Y:2023 Install timers and/or thermostats $1,962 $75
LS0224 #01 Y:2023 Reduce the pressure of compressed air to the minimum required $1,796 $25
CI0026 #08 Y:2023 Separate controls of air handlers from ac/ heating systems $458 $400
CI0026 #07 Y:2023 Install occupancy sensors $500 $2,000
CI0026 #06 Y:2023 Utilize higher efficiency lamps and/or ballasts $2,873 $8,074
CI0026 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,454 $2,400
CI0026 #04 Y:2023 Use photocell controls $3,866 $2,700
CI0026 #03 Y:2023 Use solar heat to make electricty $6,141 $80,118
CI0026 #02 Y:2023 Adjust / maintain fork lift trucks for most efficient operation $21,942 $60,000
CI0026 #01 Y:2023 Replace boiler $40,642 $20,000
CI0013 #10 Y:2023 Separate controls of air handlers from ac/ heating systems $481 $600
CI0013 #09 Y:2023 Install occupancy sensors $1,704 $2,000
CI0013 #08 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $4,109 $3,000
CI0013 #07 Y:2023 Adjust / maintain fork lift trucks for most efficient operation $13,319 $60,000
CI0013 #06 Y:2023 Use photocell controls $15,628 $2,250