ITAC Assessment: LS0224
ITAC logo
ITAC Assessment: LS0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Industrial Laundry Service
NAICS 812332: Industrial Launderers
SIC 7218: Industrial Launderers
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 168,000
ft2
Annual Production 17,160,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,561 1,461,888
kWh
Electricity Demand $14,787 3,589
kW-mo/yr
Natural Gas $106,431 12,472
MMBtu
TOTAL YEARLY COSTS $247,779
RECOMMENDED SAVINGS* $248,542 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $180,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,796 $25 $1,796
20,640
kWh
- - -
02 2.7261: Install timers and/or thermostats $1,962 $75 $1,962
22,549
kWh
- - -
03 2.2437: Recover waste heat from equipment $17,495 $20,000 - - $17,495
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,104 $1,413 $1,013
11,644
kWh
$91
-
kW-mo/yr
- -
05 4.111: Add equipment/ operators to reduce production bottleneck $175,678 $600,000 $(-18,419.0)
(-211,719)
kWh
- - $194,097
06 2.7232: Replace existing hvac unit with high efficiency model $12,486 $113,400 $12,486
143,520
kWh
- - -
07 2.9114: Use solar heat to make electricty $38,021 $514,800 $38,021
437,019
kWh
- - -
TOTAL RECOMMENDED $248,542 $1,249,713 $36,859
423,653
kWh
$91
-
kW-mo/yr
$17,495
-
MMBtu
$194,097
TOTAL IMPLEMENTED $180,540 $601,513 $(-13,648.0)
(-156,886)
kWh
$91
-
kW-mo/yr
- $194,097
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs