ITAC Assessment: IA0228
ITAC logo
ITAC Assessment: IA0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product transmission housings
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,290 3,742,673
kWh
Electricity Demand $19,101 7,260
kW-mo/yr
Natural Gas $3,486 702
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,498

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,046 $344 $2,467
129,836
kWh
$1,579
-
kW-mo/yr
02 2.4221: Install compressor air intakes in coolest locations $634 $581 $386
20,223
kWh
$248
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $525 $2,320 $233
12,309
kWh
$292
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $468 $50 $285
14,947
kWh
$183
-
kW-mo/yr
05 2.7135: Install occupancy sensors $424 $865 $424
22,274
kWh
-
06 2.6218: Turn off equipment when not in use $226 $50 $87
4,689
kWh
$139
-
kW-mo/yr
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,067 - $650
34,291
kWh
$417
-
kW-mo/yr
TOTAL RECOMMENDED $7,390 $4,210 $4,532
238,569
kWh
$2,858
-
kW-mo/yr
TOTAL IMPLEMENTED $6,498 $3,295 $3,823
201,348
kWh
$2,675
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs