Assessment Year | 1999 |
---|---|
Principal Product | transmission housings |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
50,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,290 | 3,742,673 |
kWh
|
$0.027 |
Electricity Demand | $19,101 | 7,260 |
kW-mo/yr
|
$2.63 |
Natural Gas | $3,486 | 702 |
MMBtu
|
$4.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,498 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,046 | $344 |
$2,467
129,836
kWh
|
$1,579
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $634 | $581 |
$386
20,223
kWh
|
$248
-
kW-mo/yr
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $525 | $2,320 |
$233
12,309
kWh
|
$292
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $468 | $50 |
$285
14,947
kWh
|
$183
-
kW-mo/yr
|
|
05 | 2.7135: Install occupancy sensors | $424 | $865 |
$424
22,274
kWh
|
- | |
06 | 2.6218: Turn off equipment when not in use | $226 | $50 |
$87
4,689
kWh
|
$139
-
kW-mo/yr
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,067 | - |
$650
34,291
kWh
|
$417
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $7,390 | $4,210 |
$4,532
238,569
kWh
|
$2,858
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $6,498 | $3,295 |
$3,823
201,348
kWh
|
$2,675
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs