| Assessment Year | 1999 |
|---|---|
| Principal Product | transmission housings |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
50,000
ft2
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $99,290 | 3,742,673 |
kWh
|
$0.027 |
| Electricity Demand | $19,101 | 7,260 |
kW-mo/yr
|
$2.63 |
| Natural Gas | $3,486 | 702 |
MMBtu
|
$4.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,390 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,498 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,046 | $344 |
$2,467
129,836
kWh
|
$1,579
-
kW-mo/yr
|
|
| 02 | 2.4221: Install compressor air intakes in coolest locations | $634 | $581 |
$386
20,223
kWh
|
$248
-
kW-mo/yr
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $525 | $2,320 |
$233
12,309
kWh
|
$292
-
kW-mo/yr
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $468 | $50 |
$285
14,947
kWh
|
$183
-
kW-mo/yr
|
|
| 05 | 2.7135: Install occupancy sensors | $424 | $865 |
$424
22,274
kWh
|
- | |
| 06 | 2.6218: Turn off equipment when not in use | $226 | $50 |
$87
4,689
kWh
|
$139
-
kW-mo/yr
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,067 | - |
$650
34,291
kWh
|
$417
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $7,390 | $4,210 |
$4,532
238,569
kWh
|
$2,858
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $6,498 | $3,295 |
$3,823
201,348
kWh
|
$2,675
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs