ITAC Assessment: OK1180
ITAC logo
ITAC Assessment: OK1180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Clean laundry
NAICS 812332: Industrial Launderers
SIC 7218: Industrial Launderers
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 20,500
ft2
Annual Production 300,000
lb
Production Hrs. Annual 4,380
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,038 1,583,000
kWh
Natural Gas $91,124 17,993
MMBtu
Waste Disposal Costs
Water Usage $47,261 8,207
Tgal
Water Disposal $47,261 8,207
Tgal
TOTAL YEARLY COSTS $368,684
RECOMMENDED SAVINGS* $57,581 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $29,905 $202,176 $29,905
257,805
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,099 $3,630 $4,099
35,338
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,365 - $1,365
11,763
kWh
-
04 2.7226: Use computer programs to optimize hvac performance $12,823 $110,000 $8,704
75,033
kWh
$4,119
-
MMBtu
05 2.7211: Clean and maintain refrigerant condensers and towers $9,389 $1,400 $9,389
80,942
kWh
-
TOTAL RECOMMENDED $57,581 $317,206 $53,462
460,881
kWh
$4,119
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs