ITAC Assessment: WM0030
ITAC logo
ITAC Assessment: WM0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Heavy Military Trucks and Trailers
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $5
M
to 10
M
# of Employees 830
Plant Area 261,000
ft2
Annual Production 3,385
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $421,420 7,893,759
kWh
Electricity Demand $232,627 28,409
kW-mo/yr
Electricity Fees $37,846 -
Natural Gas $298,129 63,943
MMBtu
LPG $64,474 4,488
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,398

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2437: Recover waste heat from equipment $1,439 $1,853 - - $1,439
-
MMBtu
-
02 2.7231: Use radiant heater for spot heating $17,111 $9,180 - - $17,111
-
MMBtu
-
03 2.7134: Use photocell controls $2,234 $4,550 $2,234
30,891
kWh
- - -
04 2.7111: Reduce illumination to minimum necessary levels $1,570 $500 $1,526
27,264
kWh
$44
-
kW-mo/yr
- -
05 2.7221: Lower temperature during the winter season and vice-versa $1,064 - $1,064
14,582
kWh
- - -
06 2.7243: Improve air circulation with destratification fans / other methods $34,398 $69,000 - - $34,398
-
MMBtu
-
07 4.454: Modify startup/shutdown times $3,034 - - - - $3,034
08 2.7135: Install occupancy sensors $473 $546 $473
8,080
kWh
- - -
TOTAL RECOMMENDED $61,323 $85,629 $5,297
80,817
kWh
$44
-
kW-mo/yr
$52,948
-
MMBtu
$3,034
TOTAL IMPLEMENTED $34,398 $69,000 - - $34,398
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs