Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Hotels, rooming houses, camps, and other lodging places
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0427 #03 Y:2024 Use solar heat to make electricty $16,714 $131,059
MS0427 #02 Y:2024 Install occupancy sensors $963 $1,105
MS0427 #01 Y:2024 Reduce heat gain by window tinting $3,989 $14,159
MUCM18 #09 Y:2024 Use solar heat to make electricty $27,771 $180,605
MUCM18 #08 Y:2024 Close holes and openings in building such as broken windows $652 $481
MUCM18 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $165 -
MUCM18 #06 Y:2024 Install occupancy sensors $79 $125
MUCM18 #05 Y:2024 Reduce illumination to minimum necessary levels $63 -
MUCM18 #04 Y:2024 Turn off equipment when not in use $265 $567
MUCM18 #03 Y:2024 Use or replace with energy efficient substitutes $151 $717
MUCM18 #02 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,057 $3,161
MUCM18 #01 Y:2024 Use optimum temperature $259 -
UU0243 #07 Y:2023 Optimize plant power factor $1,900 $6,000
UU0243 #06 Y:2023 Use cooling tower or economizer to replace chiller cooling $2,800 $6,300
UU0243 #05 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $3,244 $14,145
UU0243 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $4,631 $22,338
UU0243 #03 Y:2023 Cover open tanks $9,190 $7,340
UU0243 #02 Y:2023 Use power during off-peak periods $15,800 $13,000
UU0243 #01 Y:2023 Air condition only space necessary $26,330 $19,500
LS2023 #07 Y:2023 Improve combustion control capability $17,898 $60,000