Assessment Year | 2024 |
---|---|
Principal Product | Summer Camp |
NAICS | 721211: RV (Recreational Vehicle) Parks and Campgrounds |
SIC | 7033: Recreational Vehicle Parks and Campsites |
Sales Range | less than $500 k |
# of Employees | 40 |
Plant Area |
74,616
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $28,344 | 192,050 |
kWh
|
$0.15 |
Electricity Fees | $6,648 | - |
|
- |
Natural Gas | $18,040 | 1,587 |
MMBtu
|
$11.37 |
TOTAL YEARLY COSTS | $53,031 | |||
RECOMMENDED SAVINGS* | $30,461 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $259 | - | - |
$259
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,057 | $3,161 |
$1,057
7,048
kWh
|
- | |
03 | 2.4322: Use or replace with energy efficient substitutes | $151 | $717 |
$151
1,005
kWh
|
- | |
04 | 2.6218: Turn off equipment when not in use | $265 | $567 |
$265
1,766
kWh
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $63 | - |
$63
422
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $79 | $125 |
$79
526
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $165 | - |
$165
1,102
kWh
|
- | |
08 | 2.7444: Close holes and openings in building such as broken windows | $652 | $481 |
$412
2,743
kWh
|
$240
-
MMBtu
|
|
09 | 2.9114: Use solar heat to make electricty | $27,771 | $180,605 |
$27,771
185,137
kWh
|
- | |
TOTAL RECOMMENDED | $30,461 | $185,656 |
$29,962
199,748
kWh
|
$499
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs