| Assessment Year | 1994 |
|---|---|
| Principal Product | Bakery Goods |
| NAICS |
n/a
|
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $5 M to 10M |
| # of Employees | 115 |
| Plant Area |
25,000
ft2
|
| Annual Production | 7,800,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $136,858 | 1,570,633 |
kWh
|
$0.087 |
| LPG | $51,706 | 900 |
MMBtu
|
$57.45 |
| Fuel Oil #2 | $48,544 | 11,200 |
MMBtu
|
$4.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,571 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,212 | $600 | n/a |
$1,212
13,775
kWh
|
- |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,058 | $400 | n/a | - |
$1,058
-
MMBtu
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $600 | $50 | n/a |
$600
6,741
kWh
|
- |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,772 | $20 | n/a |
$2,772
30,774
kWh
|
- |
| 05 | 2.7232: Replace existing hvac unit with high efficiency model | $1,959 | $2,584 | n/a |
$1,959
31,946
kWh
|
- |
| 06 | 2.2511: Insulate bare equipment | $520 | $130 | n/a | - |
$520
-
MMBtu
|
| 07 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,300 | $900 | n/a | - |
$1,300
-
MMBtu
|
| 08 | 2.2113: Repair or replace steam traps | $2,150 | $300 | n/a | - |
$2,150
-
MMBtu
|
| TOTAL RECOMMENDED | $11,571 | $4,984 |
$6,543
83,236
kWh
|
$5,028
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs