ITAC Assessment: DL0146
ITAC logo
ITAC Assessment: DL0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Flat Rolled Steel
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 67
Plant Area 140,000
ft2
Annual Production 150,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,981 2,024,400
kWh
Natural Gas $68,421 5,708
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6218: Turn off equipment when not in use $6,880 $1,000 $6,880
81,900
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $730 $100 $730
8,730
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $500 $1,425 $500
5,990
kWh
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,520 $125,000 $27,520
327,600
kWh
TOTAL RECOMMENDED $35,630 $127,525 $35,630
424,220
kWh
TOTAL IMPLEMENTED $7,610 $1,100 $7,610
90,630
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs