Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Beer, wine, and distilled alcoholic beverages
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0227 #06 Y:2023 Install timers and/or thermostats $5,836 $30,292
DL0227 #05 Y:2023 Use radiant heater for spot heating $3,640 $10,608
DL0227 #04 Y:2023 Use optimum temperature $6,362 -
DL0227 #03 Y:2023 Turn off equipment during breaks, reduce operating time $1,027 $552
DL0227 #02 Y:2023 Utilize controls to operate equipment only when needed $8,653 -
DL0227 #01 Y:2023 Utilize controls to operate equipment only when needed $10,298 -
CI0003 #08 Y:2022 Recharge batteries on during off-peak demand periods $1,200 $500
CI0003 #07 Y:2022 Reduce the pressure of compressed air to the minimum required $1,557 $25
CI0003 #06 Y:2022 Use photocell controls $3,744 $1,166
CI0003 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $6,715 $8,580
CI0003 #04 Y:2022 Use most efficient type of electric motors $7,448 $7,600
CI0003 #03 Y:2022 Use solar heat to make electricty $16,393 $82,655
CI0003 #02 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $30,546 $600
CI0003 #01 Y:2022 Insulate glazing, walls, ceilings, and roofs $87,136 $114,800
BS0152 #05 Y:2021 Use or replace with energy efficient substitutes $71,968 $162,000
BS0152 #04 Y:2021 Install occupancy sensors $60,903 $7,355
BS0152 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $701 $414
BS0152 #02 Y:2021 Use most efficient type of electric motors $7,503 $8,301
BS0152 #01 Y:2021 Use waste heat from hot flue gases to preheat $81,594 $114,156
MI0185 #06 Y:2009 Install partitions to reduce size of conditioned space $5,182 $640