Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fresh fruits and vegetables
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0949 #07 Y:2020 Optimize plant power factor $1,392 $5,106
GT0949 #06 Y:2020 Turn off equipment during breaks, reduce operating time $461 $425
GT0949 #05 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $13,586 $4,500
GT0949 #04 Y:2020 Install timers and/or thermostats $2,159 $451
GT0949 #03 Y:2020 Recharge batteries on during off-peak demand periods $2,978 $400
GT0949 #02 Y:2020 Apply for tax-free status for energy purchases $19,356 $2,000
GT0949 #01 Y:2020 Reduce the pressure of compressed air to the minimum required $4,422 $400
SD0469 #09 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,250 $200
SD0469 #08 Y:2013 Reduce the pressure of compressed air to the minimum required $1,817 $600
SD0469 #07 Y:2013 Recharge batteries on during off-peak demand periods $3,825 $1,500
SD0469 #06 Y:2013 Replace electrically-operated equipment with fossil fuel equipment $7,769 $7,320
SD0469 #05 Y:2013 Replace electrically-operated equipment with fossil fuel equipment $10,014 $15,500
SD0469 #04 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $10,246 $10,350
SD0469 #03 Y:2013 Replace existing hvac unit with high efficiency model $15,384 $50,200
SD0469 #02 Y:2013 Use optimum size and capacity equipment $23,156 $8,740
SD0469 #01 Y:2013 Clean or color roof to reduce solar load $37,421 $53,250