ITAC Assessment: SD0469
ITAC logo
ITAC Assessment: SD0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product vegetables
NAICS 424480: Fresh Fruit and Vegetable Merchant Wholesalers
SIC 5148: Fresh Fruits and Vegetables
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 71,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,282 4,128,415
kWh
Electricity Demand $147,583 7,970
kW-mo/yr
Natural Gas $1,328 149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $110,882 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,671

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7425: Clean or color roof to reduce solar load $37,421 $53,250 $37,421
545,502
kWh
- - -
02 2.4323: Use optimum size and capacity equipment $23,156 $8,740 $16,904
246,415
kWh
$6,252
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $15,384 $50,200 $12,982
189,247
kWh
$2,402
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,246 $10,350 $8,646
126,013
kWh
$1,600
-
kW-mo/yr
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,014 $15,500 $3,775
55,022
kWh
$8,210
-
kW-mo/yr
$(-1,971.0)
-
MMBtu
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,769 $7,320 $7,769
113,247
kWh
- - -
07 2.3132: Recharge batteries on during off-peak demand periods $3,825 $1,500 - $1,672
-
kW-mo/yr
- $2,153
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,817 $600 $1,817
26,488
kWh
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,250 $200 $1,142
16,644
kWh
$108
-
kW-mo/yr
- -
TOTAL RECOMMENDED $110,882 $147,660 $90,456
1,318,578
kWh
$20,244
-
kW-mo/yr
$(-1,971.0)
-
MMBtu
$2,153
TOTAL IMPLEMENTED $38,671 $53,450 $38,563
562,146
kWh
$108
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings