Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Packaged frozen foods
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ1000 #06 Y:2023 Lower temperature during the winter season and vice-versa $7,061 $1,100
MZ1000 #05 Y:2023 Install or upgrade insulation on hvac distribution systems $2,995 $2,131
MZ1000 #04 Y:2023 Use properly designed and sized hvac equipment $2,463 $900
MZ1000 #03 Y:2023 Install occupancy sensors $269 $560
MZ1000 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $66,389 $51,304
MZ1000 #01 Y:2023 Install vinyl strip / high speed / air curtain doors $41,539 $5,853
AS0536 #05 Y:2022 Install occupancy sensors $294 $77
AS0536 #04 Y:2022 Utilize energy-efficient belts and other improved mechanisms $1,609 $579
AS0536 #03 Y:2022 Use computer programs to optimize hvac performance $7,644 $1,415
AS0536 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $19,017 $3,981
AS0536 #01 Y:2022 Use solar heat to make electricty $43,996 $407,250
SF0399 #14 Y:2011 Adopt in-house material generation $38,710 $49,256
SF0399 #13 Y:2011 Size electric motors for peak operating efficiency $11,038 $65,479
SF0399 #12 Y:2011 Install occupancy sensors $5,862 $26,604
SF0399 #11 Y:2011 Size electric motors for peak operating efficiency $18,286 $77,335
SF0399 #10 Y:2011 Use heat from boiler blowdown to preheat boiler feed water $6,800 $37,014
SF0399 #09 Y:2011 Utilize higher efficiency lamps and/or ballasts $78,758 $307,524
SF0399 #08 Y:2011 Modify refrigeration system to operate at a lower pressure $31,982 $112,500
SF0399 #07 Y:2011 Insulate bare equipment $1,028 $4,855
SF0399 #06 Y:2011 Size electric motors for peak operating efficiency $835 $2,209