48
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Packaged frozen foods | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MZ1000 #06 Y:2023 | 06 | 2023 | Lower temperature during the winter season and vice-versa | $7,061 | $1,100 |
n/a
|
MZ1000 #05 Y:2023 | 05 | 2023 | Install or upgrade insulation on hvac distribution systems | $2,995 | $2,131 |
n/a
|
MZ1000 #04 Y:2023 | 04 | 2023 | Use properly designed and sized hvac equipment | $2,463 | $900 |
n/a
|
MZ1000 #03 Y:2023 | 03 | 2023 | Install occupancy sensors | $269 | $560 |
n/a
|
MZ1000 #02 Y:2023 | 02 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $66,389 | $51,304 |
n/a
|
MZ1000 #01 Y:2023 | 01 | 2023 | Install vinyl strip / high speed / air curtain doors | $41,539 | $5,853 |
n/a
|
AS0536 #05 Y:2022 | 05 | 2022 | Install occupancy sensors | $294 | $77 | |
AS0536 #04 Y:2022 | 04 | 2022 | Utilize energy-efficient belts and other improved mechanisms | $1,609 | $579 | |
AS0536 #03 Y:2022 | 03 | 2022 | Use computer programs to optimize hvac performance | $7,644 | $1,415 | |
AS0536 #02 Y:2022 | 02 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $19,017 | $3,981 | |
AS0536 #01 Y:2022 | 01 | 2022 | Use solar heat to make electricty | $43,996 | $407,250 | |
SF0399 #14 Y:2011 | 14 | 2011 | Adopt in-house material generation | $38,710 | $49,256 | |
SF0399 #13 Y:2011 | 13 | 2011 | Size electric motors for peak operating efficiency | $11,038 | $65,479 | |
SF0399 #12 Y:2011 | 12 | 2011 | Install occupancy sensors | $5,862 | $26,604 | |
SF0399 #11 Y:2011 | 11 | 2011 | Size electric motors for peak operating efficiency | $18,286 | $77,335 | |
SF0399 #10 Y:2011 | 10 | 2011 | Use heat from boiler blowdown to preheat boiler feed water | $6,800 | $37,014 | |
SF0399 #09 Y:2011 | 09 | 2011 | Utilize higher efficiency lamps and/or ballasts | $78,758 | $307,524 | |
SF0399 #08 Y:2011 | 08 | 2011 | Modify refrigeration system to operate at a lower pressure | $31,982 | $112,500 | |
SF0399 #07 Y:2011 | 07 | 2011 | Insulate bare equipment | $1,028 | $4,855 | |
SF0399 #06 Y:2011 | 06 | 2011 | Size electric motors for peak operating efficiency | $835 | $2,209 |