| Assessment Year | 2024 |
|---|---|
| Principal Product | frozen food |
| NAICS | 454390: Other Direct Selling Establishments |
| SIC | 5142: Packaged Frozen Foods |
| Sales Range | $100 M to 500M |
| # of Employees | 89 |
| Plant Area |
186,000
ft2
|
| Annual Production | 392,558,018
lb
|
| Production Hrs. Annual | 5,824
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $263,636 | 5,095,288 |
kWh
|
$0.052 |
| Electricity Demand | $235,347 | 10,653 |
kW-mo/yr
|
$22.09 |
| Natural Gas | $58,476 | 5,387 |
MMBtu
|
$10.86 |
| TOTAL YEARLY COSTS | $557,459 | |||
| RECOMMENDED SAVINGS* | $120,716 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,519 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $41,539 | $5,853 |
$41,539
803,484
kWh
|
- | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $66,389 | $51,304 |
$66,389
1,284,120
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $269 | $560 |
$269
5,203
kWh
|
- | |
| 04 | 2.7233: Use properly designed and sized hvac equipment | $2,463 | $900 |
$1,546
29,918
kWh
|
$917
-
kW-mo/yr
|
|
| 05 | 2.7212: Install or upgrade insulation on hvac distribution systems | $2,995 | $2,131 |
$1,891
36,571
kWh
|
$1,104
-
kW-mo/yr
|
|
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $7,061 | $1,100 |
$7,061
136,590
kWh
|
- | |
| TOTAL RECOMMENDED | $120,716 | $61,848 |
$118,695
2,295,886
kWh
|
$2,021
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $12,519 | $4,131 |
$10,498
203,079
kWh
|
$2,021
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs