ITAC Assessment: AS0536
ITAC logo
ITAC Assessment: AS0536
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product packaged frozen goods
NAICS 424420: Packaged Frozen Food Merchant Wholesalers
SIC 5142: Packaged Frozen Foods
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 86,002
ft2
Annual Production 1
units
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,206 2,586,561
kWh
Electricity Demand $28,856 5,019
kW-mo/yr
Electricity Fees $51,020 -
Natural Gas $1,632 98
MMBtu
Waste Disposal Costs
Water Usage $50,758 5,707
Tgal
TOTAL YEARLY COSTS $293,472
RECOMMENDED SAVINGS* $72,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $43,996 $407,250 $17,471
280,431
kWh
$26,525
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,017 $3,981 $15,590
250,236
kWh
$3,427
-
kW-mo/yr
03 2.7226: Use computer programs to optimize hvac performance $7,644 $1,415 $5,740
91,944
kWh
$1,904
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,609 $579 $1,363
21,876
kWh
$246
-
kW-mo/yr
05 2.7135: Install occupancy sensors $294 $77 $258
4,146
kWh
$36
-
kW-mo/yr
TOTAL RECOMMENDED $72,560 $413,302 $40,422
648,633
kWh
$32,138
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs