ITAC Assessment: GT0459
ITAC logo
ITAC Assessment: GT0459
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MULTI WIRE CIRCUIT BOARD
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 20,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $271,739 4,853,458
kWh
Natural Gas $158,516 30,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $98,773 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $60,620 $26,000 - $60,620
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,539 $300 - $1,539
-
MMBtu
-
03 2.2414: Use waste heat from hot flue gases to preheat $7,845 $10,500 - $7,845
-
MMBtu
-
04 2.2135: Repair and eliminate steam leaks $2,200 $400 - $2,200
-
MMBtu
-
05 2.2123: Insulate feedwater tank $200 $440 - $200
-
MMBtu
-
06 2.3191: Use demand controller or load shedder $11,065 $12,750 $11,065
-
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,417 $2,080 $1,747
32,239
kWh
- $(-330.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,321 $17,890 $4,321
80,012
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $249 $340 $249
4,689
kWh
- -
10 2.7261: Install timers and/or thermostats $9,317 $2,400 $9,317
377,198
kWh
- -
TOTAL RECOMMENDED $98,773 $73,100 $26,699
494,138
kWh
$72,404
-
MMBtu
$(-330.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs