Assessment Year | 1992 |
---|---|
Principal Product | MULTI WIRE CIRCUIT BOARD |
NAICS |
n/a
|
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 20,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $271,739 | 4,853,458 |
kWh
|
$0.056 |
Natural Gas | $158,516 | 30,218 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $98,773 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $60,620 | $26,000 | - |
$60,620
-
MMBtu
|
- | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,539 | $300 | - |
$1,539
-
MMBtu
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $7,845 | $10,500 | - |
$7,845
-
MMBtu
|
- | |
04 | 2.2135: Repair and eliminate steam leaks | $2,200 | $400 | - |
$2,200
-
MMBtu
|
- | |
05 | 2.2123: Insulate feedwater tank | $200 | $440 | - |
$200
-
MMBtu
|
- | |
06 | 2.3191: Use demand controller or load shedder | $11,065 | $12,750 |
$11,065
-
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,417 | $2,080 |
$1,747
32,239
kWh
|
- | $(-330.0) | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,321 | $17,890 |
$4,321
80,012
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $249 | $340 |
$249
4,689
kWh
|
- | - | |
10 | 2.7261: Install timers and/or thermostats | $9,317 | $2,400 |
$9,317
377,198
kWh
|
- | - | |
TOTAL RECOMMENDED | $98,773 | $73,100 |
$26,699
494,138
kWh
|
$72,404
-
MMBtu
|
$(-330.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs