Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Durable goods, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2502 #08 Y:2025 Use computer programs to optimize hvac performance $8,276 $1,800
UL2502 #07 Y:2025 Use solar heat to make electricty $74,556 $570,771
UL2502 #06 Y:2025 Reduce illumination to minimum necessary levels $3,639 -
UL2502 #05 Y:2025 Install occupancy sensors $753 $155
UL2502 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $94 $35
UL2502 #03 Y:2025 Optimize plant power factor $2,331 $7,280
UL2502 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $1,066 -
UL2502 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,810 $630
BS0133 #03 Y:2019 Install occupancy sensors $389 $420
BS0133 #02 Y:2019 Reduce the pressure of compressed air to the minimum required $2,413 $1,850
BS0133 #01 Y:2019 Re-size charging openings or add movable cover or door $3,424 $2,090
SD0446 #06 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $1,195 $3,425
SD0446 #05 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $2,589 $3,425
SD0446 #04 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $15,478 $15,745
SD0446 #03 Y:2012 Use waste heat from hot flue gases to preheat $11,000 $4,045
SD0446 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $3,854 $500
SD0446 #01 Y:2012 Reduce the pressure of compressed air to the minimum required $629 $100