Assessment Year | 2012 |
---|---|
Principal Product | Acoustic and Electric Guitars |
NAICS | 425120: Wholesale Trade Agents and Brokers |
SIC | 5099: Durable Goods, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
65,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $257,461 | 2,951,611 |
kWh
|
$0.087 |
Electricity Demand | $182,088 | 8,218 |
kW-mo/yr
|
$22.16 |
Electricity Fees | $1,763 | - |
|
- |
Natural Gas | $34,544 | 4,325 |
MMBtu
|
$7.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,745 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,961 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $629 | $100 |
$629
7,208
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,854 | $500 |
$2,538
29,110
kWh
|
$1,316
-
kW-mo/yr
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $11,000 | $4,045 | - | - |
$11,000
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,478 | $15,745 |
$10,193
116,891
kWh
|
$5,285
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,589 | $3,425 |
$2,589
29,691
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,195 | $3,425 |
$1,195
13,704
kWh
|
- | - | |
TOTAL RECOMMENDED | $34,745 | $27,240 |
$17,144
196,604
kWh
|
$6,601
-
kW-mo/yr
|
$11,000
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,961 | $20,390 |
$13,360
153,209
kWh
|
$6,601
-
kW-mo/yr
|
$11,000
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs