ITAC Assessment: LE0144
ITAC logo
ITAC Assessment: LE0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Polyvinyl Chloride (PVC) Compounder
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 58
Plant Area 45,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $254,873 4,083,750
kWh
Electricity Demand $75,340 10,856
kW-mo/yr
Natural Gas $16,000 1,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,459 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $1,579 $1,000 $1,328
21,287
kWh
$251
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,456 - $4,305
68,989
kWh
$1,151
-
kW-mo/yr
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $3,820 $9,600 - - $3,820
-
MMBtu
04 2.2625: Chill water to the highest temperature possible $968 - $968
15,520
kWh
- -
05 2.7442: Keep doors and windows shut when not on use $636 - - - $636
-
MMBtu
TOTAL RECOMMENDED $12,459 $10,600 $6,601
105,796
kWh
$1,402
-
kW-mo/yr
$4,456
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs