ITAC Assessment: LT8397
ITAC logo
ITAC Assessment: LT8397
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Frozen Drink Machines
NAICS 423990: Other Miscellaneous Durable Goods Merchant Wholesalers
SIC 5099: Durable Goods, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 50,000
ft2
Annual Production 3,600
units
Production Hrs. Annual 2,340
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,809 510,482
kWh
Electricity Demand $2,340 851
kW-mo/yr
Waste Disposal Costs
Water Usage $888 117
Tgal
Water Disposal $1,323 117
Tgal
TOTAL YEARLY COSTS $60,359
RECOMMENDED SAVINGS* $19,622 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,937 $4,003 $17,937
164,109
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $2,298 $380
3,478
kWh
$36
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $1,111 $888 $1,039
9,510
kWh
$88
-
kW-mo/yr
$(-16.1)
04 2.6218: Turn off equipment when not in use $158 $63 $138
1,264
kWh
$20
-
kW-mo/yr
-
TOTAL RECOMMENDED $19,622 $7,252 $19,495
178,360
kWh
$143
-
kW-mo/yr
$(-16.1)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs