34
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Metals service centers and offices | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IC0217 #06 Y:2019 | 06 | 2019 | Utilize higher efficiency lamps and/or ballasts | $6,967 | $7,769 | |
IC0217 #05 Y:2019 | 05 | 2019 | Burn wood by-products for heat | $5,683 | $15,144 | |
IC0217 #04 Y:2019 | 04 | 2019 | Use most efficient type of electric motors | $62,274 | $210,000 | |
IC0217 #03 Y:2019 | 03 | 2019 | Reduce the pressure of compressed air to the minimum required | $2,925 | $300 | |
IC0217 #02 Y:2019 | 02 | 2019 | Install compressor air intakes in coolest locations | $2,588 | $1,928 | |
IC0217 #01 Y:2019 | 01 | 2019 | Use waste heat from hot flue gases to preheat | $33,543 | $6,600 | |
IC0158 #08 Y:2009 | 08 | 2009 | Conserve energy by efficient use of vending machines | $249 | - | |
IC0158 #07 Y:2009 | 07 | 2009 | Keep doors and windows shut when not on use | $2,800 | - | |
IC0158 #06 Y:2009 | 06 | 2009 | Keep equipment clean | $2,325 | - | |
IC0158 #05 Y:2009 | 05 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,265 | $1,495 | |
IC0158 #04 Y:2009 | 04 | 2009 | Reduce the pressure of compressed air to the minimum required | $196 | - | |
IC0158 #03 Y:2009 | 03 | 2009 | Turn off equipment when not in use | $2,880 | - | |
IC0158 #02 Y:2009 | 02 | 2009 | Make a practice of turning off lights when not needed | $177 | - | |
IC0158 #01 Y:2009 | 01 | 2009 | Utilize higher efficiency lamps and/or ballasts | $393 | $686 | |
DL0030 #06 Y:2008 | 06 | 2008 | Install compressor air intakes in coolest locations | $120 | $140 | |
DL0030 #05 Y:2008 | 05 | 2008 | Lower temperature during the winter season and vice-versa | $10,675 | - | |
DL0030 #04 Y:2008 | 04 | 2008 | Improve air circulation with destratification fans / other methods | $6,890 | $7,500 | |
DL0030 #03 Y:2008 | 03 | 2008 | Utilize higher efficiency lamps and/or ballasts | $1,623 | $5,306 | |
DL0030 #02 Y:2008 | 02 | 2008 | Utilize higher efficiency lamps and/or ballasts | $16,055 | $25,852 | |
DL0030 #01 Y:2008 | 01 | 2008 | Replace boiler | $5,600 | - |