ITAC Assessment: IC0217
ITAC logo
ITAC Assessment: IC0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Steel Processing and Pickling of Master Coils
NAICS 423510: Metal Service Centers and Other Metal Merchant Wholesalers
SIC 5051: Metals Service Centers and Offices
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 500,000
ft2
Annual Production 1,000,000
ton
Production Hrs. Annual 6,200
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $545,342 9,089,040
kWh
Electricity Demand $359,494 28,284
kW-mo/yr
Natural Gas $334,474 68,680
MMBtu
TOTAL YEARLY COSTS $1,239,310
RECOMMENDED SAVINGS* $113,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $33,543 $6,600 - - $33,543
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $2,588 $1,928 $1,203
20,055
kWh
$1,385
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,925 $300 $1,713
27,415
kWh
$1,212
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $62,274 $210,000 $62,274
1,037,905
kWh
- -
05 3.6123: Burn wood by-products for heat $5,683 $15,144 - - $5,683
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,967 $7,769 $1,971
32,853
kWh
$4,996
-
kW-mo/yr
-
TOTAL RECOMMENDED $113,980 $241,741 $67,161
1,118,228
kWh
$7,592
-
kW-mo/yr
$39,226
-
MMBtu
TOTAL IMPLEMENTED $49,118 $29,813 $3,684
60,268
kWh
$6,207
-
kW-mo/yr
$39,226
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs