ITAC Assessment: MI0190
ITAC logo
ITAC Assessment: MI0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product abrasives
NAICS 327910: Abrasive Product Manufacturing
SIC 3291: Abrasive Products
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area 28,000
ft2
Annual Production 60,000,000
pieces
Production Hrs. Annual 2,295
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,495 600,660
kWh
Electricity Demand $15,834 2,059
kW-mo/yr
Electricity Fees $11,069 -
LPG $15,931 515
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,582 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7221: Lower temperature during the winter season and vice-versa $11,345 $1,020 $7,842
87,130
kWh
$3,503
-
kW-mo/yr
02 2.7491: Insulate glazing, walls, ceilings, and roofs $4,171 $2,804 $3,725
41,404
kWh
$446
-
kW-mo/yr
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,721 $2,507 $1,881
20,898
kWh
$840
-
kW-mo/yr
04 2.7245: Use direct air supply to exhaust hoods $2,587 $700 $1,787
19,853
kWh
$800
-
kW-mo/yr
05 2.7425: Clean or color roof to reduce solar load $1,758 $4,871 $1,215
13,500
kWh
$543
-
kW-mo/yr
TOTAL RECOMMENDED $22,582 $11,902 $16,450
182,785
kWh
$6,132
-
kW-mo/yr
TOTAL IMPLEMENTED $14,066 $3,527 $9,723
108,028
kWh
$4,343
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs