ITAC Assessment: DL0030
ITAC logo
ITAC Assessment: DL0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product metal
NAICS 423510: Metal Service Centers and Other Metal Merchant Wholesalers
SIC 5051: Metals Service Centers and Offices
Sales Range less than $500
k
# of Employees 55
Plant Area 39,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,240
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,436 1,109,040
kWh
Natural Gas $71,172 4,852
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,963 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,473

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1224: Replace boiler $5,600 - - $5,600
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,055 $25,852 $16,055
127,420
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,623 $5,306 $1,623
13,416
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $6,890 $7,500 - $6,890
-
MMBtu
05 2.7221: Lower temperature during the winter season and vice-versa $10,675 - $10,675
7,666
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $120 $140 $120
955
kWh
-
TOTAL RECOMMENDED $40,963 $38,798 $28,473
149,457
kWh
$12,490
-
MMBtu
TOTAL IMPLEMENTED $28,473 $31,298 $28,473
149,457
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs