Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

44

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Lumber and other construction materials
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0563 #08 Y:2024 Utilize higher efficiency lamps and/or ballasts $222 $1,600
LE0563 #07 Y:2024 Minimize use of outside make-up air for ventilation except when used for economizer cycle $1,253 $9,000
LE0563 #06 Y:2024 Replace existing hvac unit with high efficiency model $6,361 $21,000
LE0563 #05 Y:2024 Replace existing hvac unit with high efficiency model $14,800 $19,440
LE0563 #04 Y:2024 Re-use or recycle hot or cold process exhaust air $5,106 $2,500
LE0563 #03 Y:2024 Install occupancy sensors $307 $140
LE0563 #02 Y:2024 Install timers and/or thermostats $2,648 $960
LE0563 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $474 $100
LE0538 #11 Y:2022 Replace existing hvac unit with high efficiency model $14,629 $46,896
LE0538 #10 Y:2022 Utilize higher efficiency lamps and/or ballasts $459 $1,341
LE0538 #09 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $10,125 $18,761
LE0538 #08 Y:2022 Install compressor air intakes in coolest locations $1,366 $2,000
LE0538 #07 Y:2022 Use properly designed and sized hvac equipment $49,716 $58,635
LE0538 #06 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $5,166 $4,521
LE0538 #05 Y:2022 Turn off equipment during breaks, reduce operating time $4,576 $4,000
LE0538 #04 Y:2022 Minimize non-essential material in heat treatment process $3,452 $1,992
LE0538 #03 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $5,256 $2,500
LE0538 #02 Y:2022 Recover waste heat from equipment $2,656 $1,200
LE0538 #01 Y:2022 Pay utility bills on time $3,047 -
OR0589 #04 Y:2012 Use or replace with energy efficient substitutes $25,028 $43,292