Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Wood Millwork for Doors and Windows
NAICS 321918: Other Millwork (including Flooring)
SIC 5031: Lumber, Plywood, Millwork, and Wood Panels
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 304,000
ft2
Annual Production 9,053
thousand feet
Production Hrs. Annual 5,500
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $437,847 8,406,079
kWh
Electricity Demand $186,484 29,096
kW-mo/yr
Electricity Fees $8,818 -
Natural Gas $93,577 19,972
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,386 - - $2,386
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,711 $6,200 $4,326
80,363
kWh
$1,385
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,823 $53,151 $8,825
161,340
kWh
$2,263
-
kW-mo/yr
$243 $1,492
04 2.4322: Use or replace with energy efficient substitutes $25,028 $43,292 $18,563
344,805
kWh
$6,465
-
kW-mo/yr
- -
TOTAL RECOMMENDED $45,948 $102,643 $31,714
586,508
kWh
$12,499
-
kW-mo/yr
$243 $1,492
TOTAL IMPLEMENTED $18,534 $59,351 $13,151
241,703
kWh
$3,648
-
kW-mo/yr
$243 $1,492
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs