ITAC Assessment: OK0256
ITAC logo
ITAC Assessment: OK0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CUSTOM INJECTION MOLDING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,795 6,963,951
kWh
Natural Gas $12,951 3,918
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,300 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,598

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $210 $600 - $210
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,378 $3,960 $1,235
38,687
kWh
- $143
03 2.7111: Reduce illumination to minimum necessary levels $230 $20 $230
7,327
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $350 $128 $350
10,551
kWh
- -
05 2.6232: Install set-back timers $515 $240 $515
12,016
kWh
- -
06 2.6232: Install set-back timers $523 $180 $523
16,120
kWh
- -
07 2.2511: Insulate bare equipment $6,776 $739 $6,776
282,239
kWh
- -
08 2.2614: Use cooling tower or economizer to replace chiller cooling $3,318 $7,200 $3,318
138,335
kWh
- -
TOTAL RECOMMENDED $13,300 $13,067 $12,947
505,275
kWh
$210
-
MMBtu
$143
TOTAL IMPLEMENTED $1,598 $1,148 $1,388
38,687
kWh
$210
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs