Assessment Year | 1988 |
---|---|
Principal Product | CUSTOM INJECTION MOLDING |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $273,795 | 6,963,951 |
kWh
|
$0.039 |
Natural Gas | $12,951 | 3,918 |
MMBtu
|
$3.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,300 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,598 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $210 | $600 | - |
$210
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,378 | $3,960 |
$1,235
38,687
kWh
|
- | $143 | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $230 | $20 |
$230
7,327
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $350 | $128 |
$350
10,551
kWh
|
- | - | |
05 | 2.6232: Install set-back timers | $515 | $240 |
$515
12,016
kWh
|
- | - | |
06 | 2.6232: Install set-back timers | $523 | $180 |
$523
16,120
kWh
|
- | - | |
07 | 2.2511: Insulate bare equipment | $6,776 | $739 |
$6,776
282,239
kWh
|
- | - | |
08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,318 | $7,200 |
$3,318
138,335
kWh
|
- | - | |
TOTAL RECOMMENDED | $13,300 | $13,067 |
$12,947
505,275
kWh
|
$210
-
MMBtu
|
$143 | ||
TOTAL IMPLEMENTED | $1,598 | $1,148 |
$1,388
38,687
kWh
|
$210
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs