Assessment Year | 2023 |
---|---|
Principal Product | Aluminum Fence |
NAICS | 423390: Other Construction Material Merchant Wholesalers |
SIC | 5039: Construction Materials, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
400,000
ft2
|
Annual Production | 200,000
ton
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $194,673 | 2,583,244 |
kWh
|
$0.075 |
Electricity Demand | $73,630 | 9,369 |
kW-mo/yr
|
$7.86 |
Electricity Fees | $5,319 | - |
|
- |
Natural Gas | $206,698 | 27,795 |
MMBtu
|
$7.44 |
TOTAL YEARLY COSTS | $480,320 | |||
RECOMMENDED SAVINGS* | $100,448 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,411 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $3,047 | - | - | - | - | $3,047 | |
02 | 2.2437: Recover waste heat from equipment | $2,656 | $1,200 | - | - |
$2,656
-
MMBtu
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,256 | $2,500 |
$3,543
47,236
kWh
|
$1,713
-
kW-mo/yr
|
- | - | |
04 | 2.2312: Minimize non-essential material in heat treatment process | $3,452 | $1,992 |
$312
4,164
kWh
|
- |
$3,140
-
MMBtu
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $4,576 | $4,000 |
$2,327
31,034
kWh
|
$2,249
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,166 | $4,521 |
$3,846
51,275
kWh
|
$1,320
-
kW-mo/yr
|
- | - | |
07 | 2.7233: Use properly designed and sized hvac equipment | $49,716 | $58,635 | - | - |
$49,716
-
MMBtu
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,366 | $2,000 |
$918
12,236
kWh
|
$448
-
kW-mo/yr
|
- | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,125 | $18,761 |
$8,239
109,854
kWh
|
$1,886
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $459 | $1,341 |
$459
6,115
kWh
|
- | - | - | |
11 | 2.7232: Replace existing hvac unit with high efficiency model | $14,629 | $46,896 |
$13,104
174,720
kWh
|
$1,525
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $100,448 | $141,846 |
$32,748
436,634
kWh
|
$9,141
-
kW-mo/yr
|
$55,512
-
MMBtu
|
$3,047 | ||
TOTAL IMPLEMENTED | $19,411 | $13,021 |
$10,634
141,781
kWh
|
$5,730
-
kW-mo/yr
|
- | $3,047 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs