ITAC Assessment: LE0538
ITAC logo
ITAC Assessment: LE0538
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aluminum Fence
NAICS 423390: Other Construction Material Merchant Wholesalers
SIC 5039: Construction Materials, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 400,000
ft2
Annual Production 200,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,673 2,583,244
kWh
Electricity Demand $73,630 9,369
kW-mo/yr
Electricity Fees $5,319 -
Natural Gas $206,698 27,795
MMBtu
TOTAL YEARLY COSTS $480,320
RECOMMENDED SAVINGS* $100,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,411

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8123: Pay utility bills on time $3,047 - - - - $3,047
02 2.2437: Recover waste heat from equipment $2,656 $1,200 - - $2,656
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,256 $2,500 $3,543
47,236
kWh
$1,713
-
kW-mo/yr
- -
04 2.2312: Minimize non-essential material in heat treatment process $3,452 $1,992 $312
4,164
kWh
- $3,140
-
MMBtu
-
05 2.6212: Turn off equipment during breaks, reduce operating time $4,576 $4,000 $2,327
31,034
kWh
$2,249
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,166 $4,521 $3,846
51,275
kWh
$1,320
-
kW-mo/yr
- -
07 2.7233: Use properly designed and sized hvac equipment $49,716 $58,635 - - $49,716
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $1,366 $2,000 $918
12,236
kWh
$448
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,125 $18,761 $8,239
109,854
kWh
$1,886
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $459 $1,341 $459
6,115
kWh
- - -
11 2.7232: Replace existing hvac unit with high efficiency model $14,629 $46,896 $13,104
174,720
kWh
$1,525
-
kW-mo/yr
- -
TOTAL RECOMMENDED $100,448 $141,846 $32,748
436,634
kWh
$9,141
-
kW-mo/yr
$55,512
-
MMBtu
$3,047
TOTAL IMPLEMENTED $19,411 $13,021 $10,634
141,781
kWh
$5,730
-
kW-mo/yr
- $3,047
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs