18
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Electric services | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0211 #07 Y:2018 | 07 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $13,109 | $3,750 | |
TT0211 #06 Y:2018 | 06 | 2018 | Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $25,620 | $100 | |
TT0211 #05 Y:2018 | 05 | 2018 | Use optimum temperature | $67,812 | $300,000 | |
TT0211 #04 Y:2018 | 04 | 2018 | Replace existing chiller with high efficiency model | $73,737 | $75,000 | |
TT0211 #03 Y:2018 | 03 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $89,245 | $600,000 | |
TT0211 #02 Y:2018 | 02 | 2018 | Use optimum size and capacity equipment | $96,921 | $15,000 | |
TT0211 #01 Y:2018 | 01 | 2018 | Flash condensate to produce lower pressure steam | $115,103 | $150,000 | |
OR0579 #07 Y:2012 | 07 | 2012 | Use photocell controls | $17,340 | $46,680 | |
OR0579 #06 Y:2012 | 06 | 2012 | Recover heat from exhausted steam, hot air or hot water | $8,805 | $18,596 | |
OR0579 #05 Y:2012 | 05 | 2012 | Replace electrically-operated equipment with fossil fuel equipment | $7,281 | $12,000 | |
OR0579 #04 Y:2012 | 04 | 2012 | Use / purchase optimum sized compressor | $2,300 | $8,200 | |
OR0579 #03 Y:2012 | 03 | 2012 | Substitute compressed air cooling with water or air cooling | $23,346 | $55,000 | |
OR0579 #02 Y:2012 | 02 | 2012 | Use most efficient type of electric motors | $125,819 | $198,800 | |
OR0579 #01 Y:2012 | 01 | 2012 | Install adequate dryers on air lines to eliminate blowdown | $15,066 | - | |
OR0552 #04 Y:2009 | 04 | 2009 | Install occupancy sensors | $18,800 | $16,200 | |
OR0552 #03 Y:2009 | 03 | 2009 | Use demand controller or load shedder | $9,900 | $7,400 | |
OR0552 #02 Y:2009 | 02 | 2009 | Size electric motors for peak operating efficiency | $6,900 | $20,000 | |
OR0552 #01 Y:2009 | 01 | 2009 | Use steam pressure reduction to generate power | $517,700 | $1,250,000 |