2,343
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
NL0103 #07 Y:2024 | 07 | 2024 | Utilize higher efficiency lamps and/or ballasts | $110 | $355 |
n/a
|
NL0103 #06 Y:2024 | 06 | 2024 | Install occupancy sensors | $114 | $428 |
n/a
|
NL0103 #05 Y:2024 | 05 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $159 | $140 |
n/a
|
NL0103 #04 Y:2024 | 04 | 2024 | Utilize higher efficiency lamps and/or ballasts | $225 | $428 |
n/a
|
NL0103 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $352 | $1,758 |
n/a
|
NL0103 #02 Y:2024 | 02 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $887 | $240 |
n/a
|
NL0103 #01 Y:2024 | 01 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $34,173 | $106,000 |
n/a
|
IC0318 #13 Y:2024 | 13 | 2024 | Install anaerobic digester | $2,295,176 | $9,930,710 |
n/a
|
IC0318 #12 Y:2024 | 12 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,250 | $1,159 |
n/a
|
IC0318 #11 Y:2024 | 11 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $74,545 | $10,174 |
n/a
|
IC0318 #10 Y:2024 | 10 | 2024 | Use or replace with energy efficient substitutes | $62,936 | $159,045 |
n/a
|
IC0318 #09 Y:2024 | 09 | 2024 | Eliminate or reduce compressed air usage | $688 | $63 |
n/a
|
IC0318 #08 Y:2024 | 08 | 2024 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $371,239 | $1,219,094 |
n/a
|
IC0318 #07 Y:2024 | 07 | 2024 | Install occupancy sensors | $2,756 | $391 |
n/a
|
IC0318 #06 Y:2024 | 06 | 2024 | Replace boiler | $133,316 | $376,143 |
n/a
|
IC0318 #05 Y:2024 | 05 | 2024 | Turn off equipment during breaks, reduce operating time | $6,255 | $8,951 |
n/a
|
IC0318 #04 Y:2024 | 04 | 2024 | Install equipment to utilize waste fuel | $2,277,853 | $9,581,351 |
n/a
|
IC0318 #03 Y:2024 | 03 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $833 | $781 |
n/a
|
IC0318 #02 Y:2024 | 02 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,649 | $4,909 |
n/a
|
IC0318 #01 Y:2024 | 01 | 2024 | Insulate glazing, walls, ceilings, and roofs | $11,344 | $4,184 |
n/a
|