Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,514

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric, gas, and sanitary services
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0480 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,565 $4,700
MI0480 #05 Y:2026 Install occupancy sensors $599 $1,230
MI0480 #04 Y:2026 Turn off equipment when not in use $10,324 $2,600
MI0480 #03 Y:2026 Reschedule plant operations or reduce load to avoid peaks $12,231 -
MI0480 #02 Y:2026 Lower temperature during the winter season and vice-versa $4,186 -
MI0480 #01 Y:2026 Air condition only space necessary $3,979 -
UF0652 #07 Y:2026 Replace the chlorination stage with an oxygen or ozone stage $3,650 $7,600
UF0652 #06 Y:2026 Use filter and drying oven to reduce sludge volume $12,547 $30,000
UF0652 #05 Y:2026 Use counter current rinsing to reduce waste water $323,609 $1,053,043
UF0652 #04 Y:2026 Provide proper maintenance of motor driven equipment $2,063 -
UF0652 #03 Y:2026 Use most efficient type of electric motors $13,103 $7,347
UF0652 #02 Y:2026 Use demand controller or load shedder $31,335 $15,438
UF0652 #01 Y:2026 Install anaerobic digester $43,759 $200,000
AS0622 #07 Y:2026 Install heat pipes / raise cooling setpoint $224 $25
AS0622 #06 Y:2026 Install set-back timers $465 $175
AS0622 #05 Y:2026 Combine utility meters $1,018 $6,134
AS0622 #04 Y:2026 Use optimum size and capacity equipment $1,810 $1,324
AS0622 #03 Y:2026 Apply for tax-free status for energy purchases $6,041 $1,600
AS0622 #02 Y:2026 Upgrade obsolete equipment $92,326 $209,020
AS0622 #01 Y:2026 Redesign process $121,513 $343,826