98
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | General warehousing and storage | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0302 #09 Y:2026 | 09 | 2026 | Pay bills on time to avoid late fees | $970 | $1,000 |
n/a
|
| UU0302 #08 Y:2026 | 08 | 2026 | Lower temperature during the winter season and vice-versa | $510 | $1,410 |
n/a
|
| UU0302 #07 Y:2026 | 07 | 2026 | Lower temperature during the winter season and vice-versa | $8,450 | $11,400 |
n/a
|
| UU0302 #06 Y:2026 | 06 | 2026 | Install timers and/or thermostats | $1,290 | $1,800 |
n/a
|
| UU0302 #05 Y:2026 | 05 | 2026 | Use less wasteful packaging | $14,500 | $44,660 |
n/a
|
| UU0302 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $880 | $740 |
n/a
|
| UU0302 #03 Y:2026 | 03 | 2026 | Use battery storage for demand control | $9,420 | $20,000 |
n/a
|
| UU0302 #02 Y:2026 | 02 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $5,000 | $9,600 |
n/a
|
| UU0302 #01 Y:2026 | 01 | 2026 | Interlock heating and air conditioning systems to prevent simultaneous operation | $103,610 | $100,000 |
n/a
|
| CI0052 #07 Y:2025 | 07 | 2025 | Use / purchase optimum sized compressor | $749 | $3,400 |
n/a
|
| CI0052 #06 Y:2025 | 06 | 2025 | Replace existing hvac unit with high efficiency model | $2,038 | $18,000 |
n/a
|
| CI0052 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $9,484 | $4,000 |
n/a
|
| CI0052 #04 Y:2025 | 04 | 2025 | Use battery storage for demand control | $19,092 | $144,127 |
n/a
|
| CI0052 #03 Y:2025 | 03 | 2025 | Recharge batteries on during off-peak demand periods | $37,060 | - |
n/a
|
| CI0052 #02 Y:2025 | 02 | 2025 | Insulate glazing, walls, ceilings, and roofs | $44,565 | $87,325 |
n/a
|
| CI0052 #01 Y:2025 | 01 | 2025 | Use solar heat to make electricty | $111,497 | $708,056 |
n/a
|
| SD0671 #06 Y:2025 | 06 | 2025 | Reduce space conditioning during non-working hours | $1,404 | - | |
| SD0671 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $6,033 | $9,226 | |
| SD0671 #04 Y:2025 | 04 | 2025 | Replace fossil fuel equipment with electrical equipment | $14,911 | $23,188 | |
| SD0671 #03 Y:2025 | 03 | 2025 | Recharge batteries on during off-peak demand periods | $3,996 | - |