Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC General warehousing and storage
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
CI0052 #07 Y:2025 Use / purchase optimum sized compressor $749 $3,400
CI0052 #06 Y:2025 Replace existing hvac unit with high efficiency model $2,038 $18,000
CI0052 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $9,484 $4,000
CI0052 #04 Y:2025 Use battery storage for demand control $19,092 $144,127
CI0052 #03 Y:2025 Recharge batteries on during off-peak demand periods $37,060 -
CI0052 #02 Y:2025 Insulate glazing, walls, ceilings, and roofs $44,565 $87,325
CI0052 #01 Y:2025 Use solar heat to make electricty $111,497 $708,056
SD0671 #06 Y:2025 Reduce space conditioning during non-working hours $1,404 -
SD0671 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,033 $9,226
SD0671 #04 Y:2025 Replace fossil fuel equipment with electrical equipment $14,911 $23,188
SD0671 #03 Y:2025 Recharge batteries on during off-peak demand periods $3,996 -
SD0671 #02 Y:2025 Use battery storage for demand control $2,541 $1,352
SD0671 #01 Y:2025 Use solar heat to make electricty $72,797 $103,994
UD1106 #03 Y:2024 Install vinyl strip / high speed / air curtain doors $11,902 $8,000
UD1106 #02 Y:2024 Use proper thickness of insulation on building envelope $411 $1,920
UD1106 #01 Y:2024 Lower temperature during the winter season and vice-versa $14,990 -
UD1095 #03 Y:2024 Lower temperature during the winter season and vice-versa $13,050 -
UD1095 #02 Y:2024 Adjust / maintain fork lift trucks for most efficient operation $581 $10,500
UD1095 #01 Y:2024 Use proper thickness of insulation on building envelope $252 $1,500
MS0426 #03 Y:2024 Reduce illumination to minimum necessary levels $15,008 $3,335